Pirates Cove Bulkhead Replacement

BULKHEAD DESIGN »

Location: Bayville, New York
Client: Town of Oyster Bay
Completion Date: 2007
Construction Cost: $500,000

Pirates Cove Bulkhead Replacement, Town of Oyster Bay Department of Public Works – The scope of this project includes the removal of an existing timber bulkhead and replacing it with a vinyl bulkhead. The new bulkhead consists of timber piles, timber wales and vinyl sheet piles.

The project included survey, mapping, soils and geotechnical analysis, seawall design, reports, site planning, cost proposals, design and specifications.