Byram River Bridge

Byram River Bridge

CONSTRUCTION INSPECTION: BRIDGES »

Location: Westchester, New York
Client: New York State Thruway Authority
Completion Date: 2006
Construction Cost: $20,000,000

Construction Inspection for the rehabilitation of the Byram River and Fox Island Road bridge in Westchester County, NY.

The work included roadway reconstruction, asphalt milling and replacement, reinforced concrete removal and replacement, steel curb replacement and painting, pavement markings, sidewalks, street lighting, navigation lights, handicap sidewalk ramp installation, waterway protection, sign structure relocation, electrical box and conduit removal and replacement, structural steel supports for water mains and maintenance and protection of traffic (MPT).

Prime consultant on this project. This project was completed on time and within budget.

Read more

Northern State Parkway Interchange Reconstruction at NY110

CONSTRUCTION INSPECTION: BRIDGES »

Location: Suffolk County, New York
Client: New York State Department of Transportation, Region 10
Completion Date: 2013
Construction Cost: $60,000,000

D030921: Provided Resident Engineering Inspection services for the reconstruction of Northern State Parkway and NY 110 Interchange including the replacement of the NSP Bridge over NY 110 BINs (1058321, 1058322); the reconfiguration of the NSP/ NY110 interchange from a cloverleaf interchange to a modified diamond interchange; the widening of NY110 from two (2) lanes to three (3) lanes in each direction; and the improvement of the NY110 intersection with Old Country Road. Work included traffic signal replacement, ITS replacement and upgrades, aesthetic features to the new bridge and in the corridor, new curbs and sidewalks, significant profile corrections, milling and resurfacing, guide rail installation, retaining walls, new drainage system including recharge basins, significant utility coordination and ROW acquisition and temporary easements.

Read more

Rehab of the Major Deegan Expressway Bridge over Mosholu Parkway

CONSTRUCTION INSPECTION: BRIDGES »

Location: Bronx, New York
Client: NYS Department of Transportation, Region 11
Completion Date: 2017
Construction Cost: $33,300,000

Provided construction inspection of the reconstruction of bridge carrying I-87 Major Deegan Expressway over Route 908F Mosholu Parkway, in Bronx County, NY.

Major elements of the reconstruction included: demolish and dispose of existing 8-inch reinforced concrete deck and steel superstructure; erect 118 ft wide and 120 ft long new steel superstructure with continuous steel girder; place rebar for new 9-inch reinforced concrete deck and pour concrete deck slab; construct a new ADA pedestrian ramp structure; demolish and dispose existing reinforced concrete pavement, median barrier, lamp post and closed drainage system with pipes and catch basins; install new median barrier and lighting system; construct new closed drainage system; relocate electrical conduits; removal and planting of trees and landscaping; extensive MPT.

Read more

Highway Bridge Maintenance Repairs on Various Highways

CONSTRUCTION INSPECTION: BRIDGES »

Location: Queens, New York
Client: New York State Department of Transportation, Region 11
Completion Date: 2017
Construction Cost: $12,200,000

As Prime Consultant, was selected to provide Construction Inspection of Maintenance Repairs on Highway Bridges in Queens County, New York City. Thirteen bridges are on 907M Grand Central Parkway, three on 908B Jackie Robinson Parkway, two on the I-295 Clearview Expressway, one is on I-678 Van Wyck Expressway, and four are on 907D Southern Parkway (Belt System). These bridges carry either the expressways or parkways over local streets or local streets over the expressways/parkways. Maintenance repair work is planned for the bridges’ superstructure or substructure elements comprised of reinforced concrete, steel, asphalt concrete or masonry.

The bridge elements requiring repairs include: bridge bearings, pedestals, pier columns and caps, deck joints, deck slabs, deck wearing surface, primary structural steel members, secondary structural steel members, bridge railing, sidewalk, drainage structures, abutments, wing walls, and approach pavement. Some of these may contain asbestos. Installation of under deck safety netting, and painting of various steel members are also planned. For BIN: 2240499 carrying Cross Bay Blvd over Jamaica Bay, repair work includes addressing yellow flags and resealing of bridge joints. Work Zone Traffic Control: lane closures on expressways, parkways and local streets are scheduled for weekdays, nights and weekends.

Read more

Gowanus Expressway Emergency Repair

CONSTRUCTION INSPECTION: BRIDGES »

Location: Brooklyn, New York
Client: New York State Department of Transportation, Region 11
Completion Date: 2012
Construction Cost: $65,000,000

Project involved the Construction Inspection of the repair of structural steel members and expansion joints along the elevated section of the Gowanus Expressway between Shore Parkway and the Gowanus Canal in Brooklyn, NY.

Construction work consisted of replacement and repair of localized deteriorated bridge deck, concrete slabs and structural steel. Project also restored bearing and painted structural steel, diamond grinding, removed existing bridge decks and replaced with new reinforced cast in place concrete deck.

Prime consultant on this project which was completed on time and within budget.

Read more