Bayswater Point State Park

Land Surveying »

Location: Queens, New York
Client: New York State Parks / Cameron Engineering
Completion Date: July 2022

Task Order 01: As a sub-consultant to Cameron Engineering, TSPE provided a boundary & topographic survey for two areas of Bayswater Point State Park in support of the design of a new water line connection. TSPE field crews collected all boundary evidence, topographic & subsurface utility data as required by the client. All topographic and planimetric features necessary for the design were collected and mapped. The boundary retracement survey for the park property entailed our technicians compiling 2 final section maps and 6 alteration maps from Queensborough Presidents office, as well record surveys of the park and adjacent parcels. Park boundary lines, city right-of-way, and proposed city street widenings were all reconciled with field collected evidence and mapped on our final survey plans.