Design Build Hunts Point Interstate Access Improvement Project – Contracts 2 & 3

CONSTRUCTION INSPECTION »

Location: Bronx, New York 
Client: New York State Department of Transportation, Region 11 / Liro
Combined Construction Cost: $810,000,000.00
Completion Date: On-going

D900051 Contract 2: TSPE, as a sub-consultant and part of the design build team, is providing construction inspection services for this project The scope of work includes: rehabilitation of Bruckner Expressway between East 141st Street and Baretto Street; demolition of ramp from Bruckner Expressway to East 138th Street, including removal of ramp superstructure, piers, abutment and retaining walls; pavement rehabilitation on Bruckner Boulevard; installation of new traffic signals; construction of shared use path; drainage improvements; sidewalk and curb replacement; stabilization of existing slopes and median improvements on Bruckner Boulevard between 138th Street and tunnel near 135th Street; and structural steel painting and protective sealing on bridge at Bruckner Expressway between 141st Street and Major Deegan Expressway.

D900055 Contract 3: TSPE, as a sub-consultant to El Sol/DeFoe JV and part of the design build team, is providing construction inspection services for this project. The scope of work includes: rehabilitation and widening of Bruckner Expressway between Barretto Street and Hunts Point Avenue; structural modifications to existing pier caps, pedestals and bearings; reconstruction of Bruckner Expressway between Hunts Point Avenue and Faile Street including superstructure substructure, piers, abutment and retaining walls; construction of two new ramps; highway lighting improvements; replacement and installation of overhead sign structures; drainage improvements; Bryant Avenue Pedestrian Bridge reconstruction; pavement rehabilitation; sidewalk and curb replacement; redesign of 6 local street intersections; construction of shared use path and bike path; and retaining wall parapet fence replacement.