Location: Queens, New York
Client: New York State Department of Transportation, Region 11 / PSE, JV / Liro
Combined Construction Cost: $736,000,000.00
Completion Date: On-going
D900048: Contract 1: TSPE, as a sub-consultant and part of the design build team, is providing construction inspection services for this project. The scope of work includes: the replacement to lengthen structures on Rockaway Boulevard, Linden Boulevard, Liberty Boulevard and 101st Avenue, all over the Van Wyck Expressway; retrofit to lengthen the 5 bridges over the Van Wyck Expressway; entrance and exit ramp relocation; upgrading curb and ramps for ADA compliance and replacing/upgrading traffic signals.
D900050: Contract 2: TSPE, as a sub-consultant and part of the design build team, is providing construction inspection services for this project. The scope of work includes: reconstruction/strengthening and replacement of the bridge carrying LIRR Atlantic Tracks #1-4 and bridge carrying LIRR Mainline Tracks #2 and #4, Montauk and Atlantic Tracks; replacement of the bridge carrying LIRR Mainline Track #1 and #3; Replacement of bridge at 94th Avenue and Atlantic Avenue over the Van Wyck; reconstruction of Northbound and Southbound Services roads; and utility replacements and relocation.