Master Plan

Subsurface Utility Mark Out »

Location: Village of Hempstead
Client: Cameron Engineering
Completion Date: On-going

As a sub-consultant to Cameron Engineering, TSPE was retained to provide the following survey information for both water and wastewater improvements in the Village of Hempstead. TSPE provided land surveying & mapping services as well as subsurface utility mark-out services for over 9000 linear feet of village roadways. Our subsurface team designation and mapped all underground utilities, drainage lines, sanitary lines including lateral building connections. Our land surveying team prepared a topographic survey and right-of-way/boundary retracement survey, encompassing all surface features within the right-of-way and 50’ beyond it’s limits.